LIBRISTO
LIBROAMANTO
povinné
Staňte se součástí komunity milovníků knih z celého světa a získejte hromadu výhod. Založit účet zdarma
0
Doprava zdarma se Zásilkovnou nad 1 499 Kč
Kurýr DPD 69 Kč Balíkovna 69 Kč PPL kurýr 74 Kč PPL box 39 Kč Zásilkovna 39 Kč Výdejní místo DPD 49 Kč PPL shop 49 Kč Balíkovna 49 Kč

Doprava zdarma při nákupu nad 1 499 Kč přes Zásilkovnu nebo PPL Box.

Construction Project

An Integrated Approach to Construction Risk Analysis, Cost Control, and Project Delivery

Jazyk AngličtinaAngličtina
Kniha Brožovaná
Kniha Construction Project Mardiaman Purba
Libristo kód: 54321191
Nakladatelství Eliva Press, říjen 2026
Construction projects are rarely delivered under stable conditions. Each product is unique and built... Celý popis
? points 246 b Připravujeme Připravujeme Nové Nové
2 458 Kč
Očekávané naskladnění Naskladnění 01. 11. 2026

Až 30 dní na vrácení zboží

Construction projects are rarely delivered under stable conditions. Each product is unique and built on site. Many organisations are involved, durations are long, and early decisions are made with limited information. Evidence from Indonesian toll road projects shows that the highest risks often arise before physical work begins. The main sources are land acquisition, utility relocation, and inter-agency coordination. This book responds to these conditions. It presents construction project risk management as a systematic process that links analysis with decisions on budget, schedule, contracts, and field control. The book consists of fourteen chapters. Chapters 1 to 3 establish the foundation. They define risk as the effect of uncertainty on objectives and treat the construction project as a system within its environment. They also explain the principles, framework, and process of ISO 31000:2018 and compare them with the PMI standard and the SHAMPU framework. Chapters 4 and 5 cover risk management planning, identification techniques, the Risk Breakdown Structure (RBS), and the risk register. They also cover the probability-impact matrix and the Relative Importance Index (RII), including instrument testing and the limitations of qualitative analysis. Chapters 6 to 9 address quantitative analysis, Monte Carlo simulation, cost and time risk, and contract and procurement risk. Chapters 10 and 11 apply the process to technical, quality, safety, and environmental risks, and then to human resource, stakeholder, and social risks. Chapter 12 discusses response strategies, residual risk, contingency reserves, key risk indicators, and risk dashboards. Chapter 13 integrates risk management with value engineering and decision analysis, including decision trees, the value of information, AHP, and robustness testing. Chapter 14 combines all of these tools in an integrated toll road case study. The case moves from identification and Pareto analysis to triangular distributions, P50, P80, and P90 estimates, residual risk, and monitoring. Each chapter contains learning objectives and theory linked to construction practice.

Herečka & Polyglotka
EWA KASP pro
Přehrát video
Ewa Kasp
Libristo má největší výběr cizojazyčné literatury. Proto své knihy kupuji tady.

Informace o knize

Plný název Construction Project
Jazyk Angličtina
Vazba Kniha - Brožovaná
Datum vydání 2026
Počet stran 404
EAN 9789999358415
ISBN 9999358411
Libristo kód 54321191
Nakladatelství Eliva Press
Váha 540
Rozměry 152 x 229 x 21
Darujte tuto knihu ještě dnes
Je to snadné
1 Přidejte knihu do košíku a zvolte doručit jako dárek 2 Obratem vám zašleme poukaz 3 Kniha dorazí na adresu obdarovaného

Přihlášení

Přihlaste se ke svému účtu. Ještě nemáte Libristo účet? Vytvořte si ho nyní!

 
povinné
povinné

Nemáte účet? Získejte výhody Libristo účtu!

Díky Libristo účtu budete mít vše pod kontrolou.

Vytvořit Libristo účet
Knižní rádce Libroamiko
Ahoj, jsem Libroamiko, můžu pomoct?